Downloads: D10.4 Validation Report for IDE Prototype
D10.4 Validation Report for IDE Prototype 1.0 | ||||
This deliverable provides the results of the third iteration validation phase focused on the IDE prototype. The objective is to show the major outcomes found after applying the validation concepts described in the revised Deliverable 10.1 “Validation Plan for prototypes” in order to better understand the middleware and IDE prototype and be able to deploy effective applications based on Hydra. The validation tests have been fulfilled during the implementation phase and in a specific testing activity and it involved both the third Hydra prototypes (IDE) but also the middleware which is under continuous development. The critical outcomes and those not planned or foreseen to occur during the software code writing are also highlighted. |
| |||
Download: (484KB) |
Downloads: 100 Downloaded: 245404 Most Downloaded: A Survey of Context-aware Middleware [ 8873 ] Most Recent: Hydra - LinkSmart brochure [ 3622 ] |